
Stand: H114
Before a heating system is installed whether it’s a renewable or conventional fossil fuel boiler, it’s important that a plumber or heating engineer completes a detailed room by room heat loss calculation meeting Part L building regulations and MCS. Heat Engineer utilises a mobile and tablet application to complete surveys. These surveys are then sent to the online ‘Heat Engineer’ platform which allows engineers and designers to access their heat loss surveys, quickly process the calculations and produce a well presented report for clients.
View website